The consent for the grid connection will be sought from the relevant owner/operator of the local transmission network,. The Network Operator will be responsible for the consenting (via a separate “Section 37” application), construction, operation, and maintenance of the grid connection.
From early-stage discussions, it is likely that the connection will tie into a new substation near Redshaw, located west of the site.